Posts In: Public

Automatic winding and timekeeping

February 27, 2018 Heritage, Public, Time, Traditional

A spiral staircase which will be climbed a little less from now on. Smith of Derby automatic winding and time regulation comes with an unseen but vitally important feature as standard – the facility to remove the new equipment without a trace should the clock ever be required in its former historical state. So at All Hallows Church in Walkington, East Yorkshire, the original winding handle is being carefully saved – just in case. In the meantime the long serving team of clock winders will be able to enjoy a well earned retirement. Keeping a clock wound up is hard…

Continue Reading

Funeral of Mr Nicholas Smith

February 22, 2018 News, Public, Time, Traditional

John Nicholas Wilkins Smith born Derby, 21st August 1935 Died peacefully at Glenfield Hospital surrounded by family on 12th February 2018. Much loved husband, father and grandfather. Funeral to celebrate his life at St Paul’s Church, Quarndon, Derbyshire on Monday 26th February at 12 noon. No flowers, but donations welcome for The Padley Centre Derby or the Gurkha Welfare Trust sent to G E Simnett & Family Funeral Directors Ltd 65 High Street, Chellaston Derby DE73 6TB.

Continue Reading

Announcement to friends of Smith of Derby Limited

February 13, 2018 Heritage, News, Public, Traditional

Dear friends of Smith of Derby Limited We are writing to you today to share the sad news that John Nicholas Wilkins Smith, our President and active Archivist passed away late yesterday afternoon. Mr Nick, as he was affectionately known by all of us here at Smith of Derby, died peacefully following a short illness and a heart operation. His family was with him. There will be more to say and share with all our friends in due course, but it is enough for now to let you know that after his family, his (literally!) lifelong association with the Smith…

Continue Reading

Case Study: Waldorf Astoria, Ras Al Khaimah

February 8, 2018 Creative, Public, Time, Uncategorized

Designer: Hirsch Bedner Associates (HBA) Location: UAE Size: 6 metres in height Materials: bronze, stainless steel, etched glass and champagne gold leaf Date: 2015 Project code: 31974 We were proud to fabricate the centrepiece lobby clock for the opulent reception at the Waldorf Astoria Luxury hotel in Ras Al Khaimah, UAE. Smith of Derby Ltd was engaged to create the centrepiece by leading London design practice, Hirsch Bedner Associates, (HBA). Seen by hotel guests who have travelled from around the world, the clock stands at over six metres high and is regarded as a golden masterpiece. Culturally rich in design,…

Continue Reading

Case Study: University of Leeds Faculty of Engineering

February 8, 2018 Creative, News, Public, Time, Uncategorized

Client: University of Leeds Location: Leeds, UK Size: 2.4m overall diameter Materials: Aluminum and LED illumination Date: 2017 Product code: 36381 We were commissioned to create a bespoke clock for the University of Leeds Faculty of Engineering as part of their renovation in 2017. Working with tones of white, brown and black, a design was developed that fitted seamlessly within the scheme. The raised illuminated ring markers on the clock responded to the main lighting which featured on the ceiling. This design device helps to bring coherence to the whole refurbished building. This 2.4 m diameter clock was created at…

Continue Reading

Case Study: 8 Salisbury Square

February 8, 2018 Creative, Public, Time, Uncategorized

Architect: TP Bennett Location: London, UK Size: 4.5 x 3.5m Materials: Bronze & LED illumination Date: 2017 Project code: 34999 Working closely with TP Bennett architects, we were commissioned to create a contemporary exterior clock for 8 Salisbury Square, London. The design of this state-of-the-art clock was created by our innovative design team, in accordance with the architects specification. Our highly skilled clockmakers then manufactured the 4.5m x 3.5m clock with care and transported the finished feature to the contractors who were manufacturing the wall panels. It was pre-installed on these prior to arrival at its final home, 8 Salisbury…

Continue Reading

Case Study: Beckfoot & Hazelbeck School

February 8, 2018 Creative, Public, Time, Uncategorized

Client: Beckfoot & Hazelbeck School Location: Bingley, UK Size: 3.9m overall diameter Materials: Aluminium Date: 2010 Project code: 31140 This 3.9m clock gives an identity to Beckfoot and Hazelbeck school’s new building. An initial sketch was sent to the design team at Smith of Derby from the architects working on the project. We integrated their ideas into a detailed design and drew on our experience of similar jobs to produce a striking yet affordable solution. Keeping in mind the contemporary design, this clock was created from anodized aluminium and features 12 digits finished in black. Every quarter digit is positioned…

Continue Reading

Case Study: St Paul’s Cathedral

Client: Whites of Appleton Location: London, UK Size: 3 X 17ft 6″ stone skeleton dial Date: Ongoing since 1893 Project code: 4005 An iconic landmark that is known around the world, St Paul’s Cathedral in London is an instantly recognizable symbol of the London skyline. Smith of Derby are proud to have built and installed St Paul’s Cathedral current clock in 1893. We have taken care of this clock ever since, ensuring that it withstands the test of time. St Paul’s Cathedral receives approximately 1,500,000 visitors every year, which puts a high responsibility on us to keep it working and…

Continue Reading

Case Study: German Gymnasium

February 8, 2018 Creative, Public, Time, Uncategorized

Client: Conran & Partners Location: London, UK Size: 2m diameter Materials: Date: 2015 Project code: 35095 We were commissioned to create a stunning feature clock at the German Gymnasium restaurant in King’s Cross, London, which opened in October 2015. The design is based upon the era of the mid-1800s: the building was created in 1864 for the German Gymnastics Society and housed the first purpose-build gymnasium in England. It was picked by the National Olympian Association to host the indoor events of the first UK-hosted Olympic Games. The clock reflects the buildings heritage and beginnings, and that it is positioned…

Continue Reading

Case Study: LSQ London

February 8, 2018 Public, Time, Uncategorized

Client: Make Architects Location: 48 Leicester Square, London Size: 4 x 1.6m overall diameter Materials: Aluminium and glass Date: 2016 Project code: 33105 In the heart of London, 48 Leicester Square is a familiar historic building.  In need of restoration but keeping the 1920’s characteristics, we were approached by Make Architects to supply and install a set of four 1.6m diameter illuminated clocks to crown each corner of the building. The brief was to capture the appeal of today’s West End while preserving the elegance of the original stone façade. With this brief in mind, our highly skilled clockmakers designed,…

Continue Reading